Skip to content
Transmission line crossing dry scrubland at dusk

Power transmission and distribution engineering

Advanced engineering for transmission lines and power systems

We design overhead, underground, and underwater solutions with technical rigor, an integrated view of the project, and the capacity to address highly complex challenges.

of designed lines with completed construction
3,000+ km
line projects designed and implemented
250+
of experience among our senior engineers
35+ years

Solutions

Engineering organized around the project

Studies, consulting, design, and implementation support for overhead, underground, and underwater lines — from routing to integration with other power-system assets.

How we work

Technical depth with a project-wide perspective

Practical experience and multidisciplinary integration guide technical, construction, and economic decisions at every stage.

  1. 01

    Multidisciplinary integration

    Electrical, civil, structural, and geotechnical assumptions handled together so the solution stays coherent end to end.

  2. 02

    Constructability from concept stage

    Every decision considers access, construction sequence, site resources, maintenance, and local constraints.

  3. 03

    Rigor for non-standard problems

    Explicit assumptions, models, and sensitivities when the answer requires analysis beyond conventional routines.

  4. 04

    Techno-economic consistency

    Alternatives compared by performance, risk, and investment impact — not just the lowest initial cost.

Numerical analysis and complex problems

When a standard solution is not enough

Problems with strong interaction among variables, geometries, materials, loads, or constraints require purpose-built models, systematic exploration of alternatives, and traceable assumptions.

  • Decision-oriented modeling

    The level of fidelity is set by the engineering question to be answered.

  • Parametric studies

    Sensitivities, limits, and dominant variables evaluated before selecting an alternative.

  • Optimization with real constraints

    Solutions compatible with safety, standards, fabrication, construction, and operation.

Visualization of a strain tower with a finite-element stress contour

Experience

Lines from 69 kV to 500 kV, in Brazil and abroad

A selection of projects GPAT has worked on.

View all projects
  • AccionaLT 500 kV Sento Sé I – Ourolândia II (CS/CD)88 km
  • AtlasLT 500 kV Boa Sorte 9 a 23 – Paracatu IV60 km
  • CoelbaLD 138 kV Rio Grande II – Rio das Éguas126 km
  • CoelbaLD 138 kV Irecê (Chesf) – Bonito (C2)92 km
  • AXPO/SGTR1480 Bickigen – Mettlen53.4 km
  • AuroraLT 230 kV Rosa do Jericó – Jaíba9 km

Who we work with

Sectors served

  • Transmission companies and utilities
  • Distribution utilities
  • Renewable generation
  • EPC contractors and integrators
  • Infrastructure investors
  • Industries with high-voltage assets
  • New project developers
  • Power-sector authorities and organizations

Does your project require analysis beyond a standard solution?

Tell us the project stage and the technical challenge. Our engineering team replies directly.

Talk to a specialist