Skip to content

Projects and experience

Selected projects from GPAT’s corporate presentation, grouped by voltage level.

projects listed
24
of lines in this selection
1,327 km

500 kV

3 projects · 152 km

ProjectClientLength
LT 500 kV Boa Sorte 9 a 23 – Paracatu IVAtlas60 km
LT 500 kV Sertão Veredas – Arinos IIAurora4 km
LT 500 kV Sento Sé I – Ourolândia II (CS/CD)Acciona88 km

230 kV

2 projects · 16 km

ProjectClientLength
LT 230 kV Rosa do Jericó – JaíbaAurora9 km
LT 230 kV Jacaracanga – Candeias EnergiaGlobal7 km

138 kV

11 projects · 738.6 km

ProjectClientLength
LD 138 kV Rio Grande II – Rio das ÉguasCoelba126 km
LD 138 kV Rio Formoso II – Santa EfigêniaGrupo Santa Efigênia8 km
LD 138 kV Irecê (Chesf) – Bonito (C2)Coelba92 km
LD 138 kV Barreiras – CristópolisCoelba86.2 km
LD 138 kV Valente – Capim Grosso IICoelba73.4 km
LD 138 kV Alto Fêmeas – Mundo VerdeCoelba72 km
LD 138 kV Paratinga – Ibotirama (operação em 69 kV)Coelba68 km
LD 138 kV Rio Formoso II – Rio FormosoCoelba67 km
LD 138 kV Ipiaú – Jequié IICoelba55 km
LD 138 kV Itapebi – BarrolândiaCoelba48 km
LD 138 kV Bonito – Mulungu do MorroCoelba43 km

69 kV

6 projects · 319.4 km

ProjectClientLength
LD 69 kV Poli II – UnigelNeoenergia0.4 km
LD 69 kV Asa Branca – IpiráCoelba88 km
LD 69 kV Catu (Chesf) – Entre Rios (C2)Coelba67 km
LD 69 kV Santo Antônio de Jesus II (Chesf)Coelba62 km
LD 69 kV Angical – PajeúCoelba58 km
LD 69 kV Morro do Chapéu II – Morro do ChapéuCoelba44 km

International

2 projects · 101.4 km

ProjectClientLength
TR1480 Bickigen – MettlenAXPO/SG53.4 km
TR1360A Pradella – La PuntAXPO/SG48 km

Organizations served

Companies and institutions that have relied on GPAT’s engineering.

  • Acciona Energia
  • Atlas Renewable Energy
  • Aurora
  • Camargo Corrêa Infra
  • CTB — Companhia de Transportes do Estado da Bahia
  • Embasa
  • Fortlev
  • Global Engenharia
  • Neoenergia
  • SENAI CIMATEC
  • Sener
  • Termoverde